Integrated Process Case(1)
The process of KV ultra-high pressure component:CNC machining→Partial electroplating→Alloy tin soldering→High-voltage testing→Assembly→Final product
Process Integration Case(2)
Development of high-frequency component - Waveguide with 5N copper strip.
Imported stainless steel square seamless tube bending process → Flang processing at both ends → Welding combination → Surface treatment (gold plating on inner wall of tube)